Final plans drawn up for Swansea city revamp

  • 6 August 2018

Arena and parkImage copyright Swansea council
Image caption A 3,500-seater arena is the main part of the first phase costing £100m

Final plans for the first phase of Swansea city centre’s regeneration which would create hundreds of jobs have been submitted.

A 3,500-seater arena is the main part of the phase costing £100m and will be surrounded by a “coastal park”.

A hotel and underground parking completes that side of the development while a digital bridge will link to the other side of Oystermouth Road.

Planners will make a decision in October.

A block containing commercial and residential units on the St David’s car park site has been included in the scheme which already has outline planning permission.

“This Swansea Central development aims to create a unique destination for Swansea and ultimately for the Welsh south coast,” a report to planners said.

“It will deliver a vibrant new piece of city fabric within the heart of Swansea city centre.”

Image copyright Swansea council
Image caption The 3,500-seater arena has been described as “one-of-a-kind”

The plans seek to create a “high quality leisure-led destination” that reflects “the pedestrian character of the old town, dealing sympathetically with its historical context”.

The arena will be the first development to be built with a target completion date of 2020.

The St David’s site would be finished two years later.

Image copyright Swansea Council
Image caption Homes, offices and shops will be built on the St Davids car park site, opposite the planned arena

“We want Swansea to become a major destination for tours, acts, conferences and events, which will boost our city centre economy by more than £40m per year and create hundreds of new local jobs,” said Swansea council leader Rob Stewart.

“Swansea Central phase one will be a world-class development, creating jobs, boosting the economy of Swansea and delivering a one-of-a-kind arena with aspects not seen in the UK before.”

Another phase of the regeneration could also include a “city beach” area with aquarium and science centre on land currently occupied by the city’s civic centre.

The whole project is expected to cost about £500m.

BBC News – Wales

Pin It on Pinterest

Share This